安裝電動卷簾門向日葵污视频下载需要注意什麽?

發布人:http://www.levels4life.com    發布時間:2018-09-13 17:21:05

1、複核洞口與產品尺寸是否相符,防火卷簾門的洞口尺寸,可根據3M。

1, check whether the hole is in conformity with the product size, and the size of the opening of the fire shutter door can be calculated according to 3M.

2、確定安裝水平線及垂直線,按設定尺寸依次安裝.槽口尺寸應準確,上下保持一致,對應槽口應在同一平麵內,然後用連接件與洞口內的預埋件焊牢。

2. Determine the installation horizontal and vertical lines, and install them in turn according to the set dimensions. The groove size should be accurate and consistent, and the corresponding groove should be in the same plane, and then welded firmly with the embedded parts in the hole.

3、卷門機必須按說明書要求安裝。

3, rolling door machine must be installed according to the instructions.

4、卷軸、文架板必須牢固地裝在混凝土結構上或預埋件上。

4, reel and rack plate must be firmly installed on concrete structure or embedded parts.

20161214578645.gif

5、寬大門體需在中間位置加裝中柱,兩邊有滑道.中柱安裝必須與地麵垂直,安裝牢固,但要拆裝方便。

5. Wide gate body should be installed in the middle of the column, both sides of the slide. The installation of the column must be vertical to the ground, installation firm, but to disassemble and install conveniently.

6、門體葉片插入滑道不得少於30mm,門體寬度偏差為土3mm。

6, door body blade insert slideway must be less than 30mm, door width deviation is soil 3mm.

7、防火卷簾門水幕係統裝在防護理下麵,噴嘴傾斜15°角。

7, fire shutter door water curtain system installed under the prevention of care, nozzle tilt 15 degrees angle.

8、安裝完略,先手動調'自試運行,觀察門體上下運行情況,正常後通電調試。

8. Installation is short, first manually adjust the'self-test operation, observe the operation of the door body up and down, after normal power-on debugging.

9、觀察卷簾機、傳動係統、門體運行情況應啟閉正常、順暢,速度為3-7米/分鍾。

9. Observing the operation of rolling shutter, transmission system and door body should be opened and closed normally and smoothly with a speed of 3-7 m/min.

10、調整製動器外殼方向,使環形鏈朝下;調整鏈條張緊度,鏈條6-10mm;調整單向調節器及限位器。

10. Adjust the direction of the brake housing to make the ring chain face down; adjust the chain tension, chain 6-10mm; adjust the unidirectional regulator and limiter.

11、卷筒安裝應先找好尺寸,並使卷簡軸保持水平位置。注意與導軌之間的距離應兩端保將一致,臨時固定後進行檢查,並進行必要的調篷、校正,無誤後再與支架預埋件用電焊焊接。

11, reel installation should first find a good size and keep the reel shaft horizontal. Attention should be paid to the distance between the guide rail and the two ends of the same, temporarily fixed after inspection, and necessary adjustments, corrections, no error and bracket embedded parts after welding.

本文的精彩內容來自:濟南遙控車庫門更多的詳細內容請點擊向日葵app下载安装无限看的官方網站:http://www.levels4life.com謝謝您的到來

The highlight of this article comes from: Jinan remote control garage door more details please click our official website: http://www.levels4life.com Thank you for coming