防火卷簾門測量設計的詳細說明!

發布人:http://www.levels4life.com    發布時間:2019-06-04 10:03:28

  防火卷簾門廣泛應用於商業建築、廠房和地下車庫,具體測量設計細節如下:

  Fire-proof rolling shutter doors are widely used in commercial buildings, factories and underground garages. Details of measurement and design are as follows:

  測量設計:

  Measurement design:

  步驟一:窗簾安裝的一般分類

  Step 1: General Classification of Curtain Installation

  1. 它可以分為:

  1. It can be divided into:

  在裝具上,即卷簾兩側導軌安裝在建築洞口內側,即安裝後的門洞有效淨寬度為原門洞減去兩根導軌的寬度(200*2),一般見兩根建築立柱之間的安裝。

  On the fixture, the guide rails on both sides of the curtain are installed inside the entrance of the building, that is, the effective net width of the entrance after installation is the width of the original entrance minus the width of the two guide rails (200*2). Generally, the installation between the two building pillars is seen.

  側安裝,即卷簾門兩側導軌安裝在建築物外孔,即安裝後的門洞有效淨寬度為原門洞的寬度,一般見牆體開開門安裝卷簾門。

  Side installation, that is, the guide rail on both sides of the curtain door is installed in the outer hole of the building, that is, the effective net width of the installed door hole is the width of the original door hole, generally see the wall open door to install the curtain door.

  邊緣媒介機構,即卷簾兩側導軌安裝在建築物內孔邊同時,安裝在樓洞外的另一邊,也就是說門孔安裝後是有效的淨寬度是原始門孔的寬度減去導軌(200 * 1),常見的看到不規則建築列或安裝孔之間。

  Edge media mechanism, that is, the guide rail on both sides of the curtain is installed at the side of the inner hole of the building and at the same time on the other side of the outside hole of the building. That is to say, the effective net width of the door hole after installation is the width of the original door hole minus the guide rail (200 * 1). It is common to see the irregular building row or between the installation holes.

20161214807515.jpg

  2. 按垂直或高低排列:

  2. Arrange vertically or vertically:

  梁上:即卷簾門後的門頭懸掛在原建築的門洞上方,通常門頭高度為400mm。

  Beam: That is, the door head behind the curtain door is suspended above the door of the original building, usually the height of the door head is 400 mm.

  梁下:即卷簾門頭懸掛在原建築門洞底部。門頭高度一般為400mm。實際有效淨高為原建築洞口高度減去門洞高度(這點應特別注意)。

  Under the beam: that is, the curtain door head is suspended at the bottom of the original building doorway. The height of the door head is generally 400 mm. The actual effective net height is the height of the original building entrance minus the height of the entrance (which should be paid special attention to).

  第二步:檢查場景

  Step 2: Check the scenario

  1、要查看卷簾門現場安裝的建築結構,根據實際情況做出卷簾門的種類選擇,要求安裝牢固的兩端機頭板和導軌。對於雙軌雙簾的安裝,要考慮兩端導軌的安裝厚度必須達到400mm,主風琴板的厚度為900mm。

  1. To inspect the construction structure of the rolling curtain door installed on the spot, make the choice of the type of rolling curtain door according to the actual situation, and require the installation of solid two-end machine head plate and guide rail. For the installation of double-track and double-curtain, it is necessary to consider that the installation thickness of the guide rail at both ends must reach 400 mm, and the thickness of the main organ board should be 900 mm.

  2,水、電和其他管道橋線框必須通過百葉窗孔,可以經常練習是安裝管道橋寬邊的線框門,管的一側用磚頭和石頭之前窄門孔測量;或將管道橋架線頂門板安裝在門頂,減小門頭的安裝位置,降低門的有效高度,用防火卷簾材料密封後,有效防止火災的蔓延。

  2. The wireframe of water, electricity and other pipeline bridges must pass through shutter holes. It can often be practiced to install wireframe doors with wide edges of pipeline bridges. The narrow gate holes in front of bricks and stones are used to measure one side of the pipeline bridges; or to install the roof of the pipeline bridges on the top of the door to reduce the installation position of the doors, reduce the effective height of the doors, and effectively prevent the spread of fires after sealing with fire-proof rolling curtain materials.

  3.確定機頭板兩端的設計安裝和導軌的位置後,開始用卷尺測量門洞。寬度=導軌兩端背麵之間的距離,高度=從地麵到機頭板頂部的距離。如果是介質安裝,則需要安裝並密封。寬度=快門寬度,高度=建築物頂部到導軌頂部的距離+50mm。

  3. After determining the design and installation of the two ends of the head plate and the position of the guide rail, the tape measure of the door hole is started. Width = the distance between the back of both ends of the guide rail and height = the distance from the ground to the top of the nose plate. If the medium is installed, it needs to be installed and sealed. Width = shutter width, height = distance from building top to rail top + 50mm.

  4,為不規則建築入口,堅定地安裝在兩端的鼻子板應充分考慮導軌(或雙導軌)安裝位置後,借材料,如磚、角鋼、H鋼加固,或支持寬度或高度隻切斷狹窄安裝寬度或高度訴諸砌塊砌築或防火材料。

  4. For the entrance of irregular buildings, the noseboard firmly installed at both ends should take full account of the installation position of guide rails (or double guideways), borrow materials such as bricks, angle steels, H steel reinforcement, or support width or height only to cut off narrow installation width or height to resort to block masonry or fireproof materials.